"Our concern on the project was water penetration into the building. We had issues on our last project where we had some infiltration and it created months and months of research to try to find out where the problems were, so we really wanted to protect as much as possible.
We wrapped the jam with the Fentrim product, we then sprayed inside the cavity and we then finished the inside also with the Fentrim product in order to get a good water seal from the outside and air infiltration. We are very happy with the product."
Hillel Katz, Director of Construction at Aore