Bridgewater Wharf, Great Britain

Luxurious high-rises were built on the River Irwell in Manchester. The challenge for M3 Build: To find a robust window sealing system that complied with fire protection Class B or higher. 

Building Location
Manchester, United Kingdom
Project type
Residential
Project size
37.500 m²
Architect
DB3 Architecture & Design
Developer
Fortis Group (Developer)
Installer
M3 Build (main contractor), Intastruct, UK Rendering (sub-contractors)
Products used
Trestard® 420 black FR
We chose the Trestard system because it is faster, easier to install and more efficient than traditional methods.
William Arcroft, Site Manager, M3 Build

Premium apartments in front of the Manchester skyline

A total of 376 apartments are being built in five distinctive high-rise buildings. These are up to eight storeys high. Bridgewater Wharf is located between the digital business hubs of MediaCityUK, the trendy bars and restaurants of Deansgate and the elegant financial district of Spinningsfields. 

Fire protection class B and efficient working as criteria for window sealing

William Arcroft and his team are responsible for installing the windows. For him it was clear: the traditional products for sealing windows are not efficient. The installation takes too long and the cleaning effort is relatively too high.

The robust, fully adhesive window tape Trestard 420 black FR fulfils the fire class B-s1,d0 required in Great Britain and is easy to apply. Furthermore, it is the ideal adhesive tape for the construction of high-rise buildings made of SFS, concrete or blockwork.

Please accept cookie policy first

Welcome to the SIGA website . to see content for your location.